oneLearning · Training requests and annual plan

Requests arrive from everywhere. The annual plan comes together in one place.

The requester submits, approvers decide in turn under your company’s rules, HR organises. Meanwhile the annual plan shows what is coming, for how many people, at what cost — and on which cost centre.

The path of a request

Four steps, and at each one you can see where it stands and who has it. Every decision, reason and comment goes into the item’s log.

  1. Request

    Title, type, area, cost centre, planned months, headcount, planned cost with currency, justification — and the quote as a PDF, if there is one. The request is saved as a draft and only reaches HR once submitted.

  2. HR review

    HR sends it for approval, approves it directly, returns it for changes, postpones or rejects it. Returning, postponing and rejecting need a reason.

  3. Approval chain

    Approvers decide in turn: only the next one in line gets the notification and the decision buttons. After a return, approval of the corrected request starts again from the top.

  4. Organising and closing

    Participants by name, groups with date and venue, attendance, then “Completed” and closing. HR’s own plan items are created as approved straight away.

New training request window: title, type, area, cost centre, plan year, quarter, selected planned months, headcount, number of groups, planned cost and currency
New training request — with sample data
Annual plan

A year of training in one list.

From requests and plan items alike. Filter by year, request and plan status, type, area and cost centre; at the top, the summary: items, planned headcount, planned and actual cost. Excel or CSV exports exactly the filtered list.

The Annual plan tab: filters, Excel and CSV buttons, Haver bar with one group to merge, summary (items, planned headcount, planned and actual cost), below it the courses with months, headcount, cost, request and plan status, approvers
Annual plan — with sample data
Statusrequest · plan Months12 in one row ExportExcel · CSV

The request status shows where approval stands; the plan status shows where delivery stands: not started, in preparation, in progress, postponed, closed or cancelled.

Who decides, and in what order? Your company’s rules say.

The approval steps are set out in a table; the number of levels is not hard-coded. When a request is sent for approval, the system goes through the rules in order, and every rule whose conditions are all met becomes a step.

Approval rules window: two sample steps with order number, condition (always; at least 100,000 forints) and approver (named user; by permission)
Approval rules — with sample data
  • Approver

    A named person, the owner of the area or cost centre, the requester’s manager, or anyone with approval rights. A deputy can be added: they can decide too, and they get the e-mail as well.

  • Condition

    A planned cost band with currency, area, training type, cost centre. With no condition, the step is always part of the chain.

  • Decision

    Approval needs no comment; rejecting, returning and postponing need a reason. Rejection is final — if it only needs fixing, the approver returns it.

  • Reminder

    If the company switches it on: a few days without a decision → a reminder to the approver, later escalation.

Example: manager (always) → area owner (always) → director (above 5000 euros). A 3000-euro request gets two steps, an 8000-euro one three.

Planned and actual cost, split by cost centre.

Cost is not one number at the bottom of a spreadsheet: per item, planned and actual, with currency, and split across the cost centres the participants come from.

  • Planned and actual

    The two are stored separately, and so are their splits. The actual cost and date go in after the training.

  • Currency

    Forints, euros or another, with a three-letter code. The annual plan summary adds up the amount converted to forints; if that is missing for a foreign-currency item, it warns you.

  • Split

    By the cost centres of the named participants, or by headcount per cost centre entered by hand; the total or the per-person amount is enough. The rows always add up exactly to the total — the rounding remainder goes to the row with the most people.

  • Budget figures

    An annual cost budget can be recorded for the company, an area or a cost centre.

Cost split window: planned cost, headcount per cost centre entered by hand, total 240,000 forints, 40,000 per person; two sample cost centres with 4 and 2 people, 160,000 and 80,000 forints, matching the total
Cost split — with sample data

Groups, attendance, a survey after the training.

An approved course can run in several groups. For each group: date, venue, training provider, headcount — and at the end, who was there.

  • Participants

    By name or employee number, up to the planned headcount. A participant can be in one group at a time; anyone who was absent or cancelled can move to the next one.

  • Attendance

    Planned, attended, absent, cancelled — per group.

  • Evaluation survey

    Assigned to the course or one of its groups, scheduled from the start, the end or the completion date, with a deadline. Each course gets its own copy, so results never mix.

Participants of a group with four sample names and their attendance: attended, attended, absent, planned
Group and attendance — with sample data

Three units asking for the same thing? One course will do.

Logistics, quality and production all want Excel basics, each under a different name. The system picks out which open requests could be served by one shared course — HR decides.

  • Group suggestion

    Requests on the same topic and level from the same plan year: from several units, a “shared course”; within one unit, a “possible repeat”. Basic and advanced never end up in the same group.

  • Suggestion with a reason

    If switched on, Haver, the built-in helper, also suggests groups from the titles, with a reason. It only sees the title, type, unit, month and headcount — no participants, names, justification or cost.

  • HR decides

    Accepts (the title can be rewritten), removes a request, or marks that they do not belong together — that pair is never suggested again. Accepting does not change the requests’ status; it only marks and logs them.

  • Shared session

    One click on an accepted group: participants are combined from the requests, each person once, and the shared participant list can be downloaded.

  • Already when entering

    When a new request is entered, the window tells anyone who sees all requests if a similar open request already exists.

Similar requests panel: two group suggestions (possible repeat within one unit; shared course for three units, accepted), with reasons and the member requests, and “Really the same — handle together” and “Don’t belong together” buttons
Similar requests — with sample data

Who sees what, and who gets an e-mail when

  • The requester sees their own requests, where approval stands and who has it.
  • The approver sees, on the “Waiting for me” tab, only what they have to decide now; the link in the notification e-mail goes there.
  • The participant sees their own courses: when they are planned and where they stand — not the cost, the justification or other participants.
  • The manager, if the company switches it on, sees their direct reports’ requests and courses, with cost, read-only.
  • Each quarter the area owner gets a list of open items, and the waiting approver and HR get reminders — each by the company’s own rule, with a test run and a send log.

Frequently asked questions about the annual training plan

What needs setting up to get started?

Training types, areas and cost centres with their owners, training providers and the approval rules. The area owner gets the quarterly e-mail and is the “area owner” approver. Budget figures and notifications can be added as needed.

Does it work with quotes in foreign currency?

Yes. Every item has its own currency, and the cost condition of an approval rule can be set with a currency too. The annual plan summary adds up the amount converted to forints and warns you if that is missing for a foreign-currency item.

Can employees see what their training costs?

No. On the “My courses” tab they see what they are enrolled on by name: when it is planned, where approval and delivery stand. Not the cost, the justification, the attached PDF or the other participants.

What happens if no approval rule fits a request?

Then HR can approve it directly. The Approvers column shows “no matching rule” in that case, so this is visible as soon as the request is submitted.

Do similar requests have to be merged by hand?

No, but the decision is HR’s. The system suggests which requests could be served by one shared course — and if switched on, Haver does too —, HR accepts or rejects, and one click turns an accepted group into a shared session. The requests’ status does not change.

Does it replace the annual training plan spreadsheet?

The annual plan comes together in the system, from requests and HR’s own plan items. Exactly the list shown by the filters can be exported to Excel or CSV.

Bring last year’s plan. We will show you how it would look here.

A spreadsheet of last year’s requests and how approval works today are enough for a first conversation.